色欲aⅴ亚洲情无码av蜜桃,国产成人精品久久亚洲高清不卡,久久久精品一区aaa片,欧美国产日韩在线三区

PU Sandwich Panel Line - PIR Sandwich Panel Production Machine - Sinowa

Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://uqmjfgu.cn/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
国产成人精品a视频一区| 麻豆国产AV剧情偷闻女邻居内裤 | 精品无码一区二区三区在线 | 好男人社区影院www| 少妇无码av无码专区在线观看| 天天躁日日躁狠狠很躁| 亚洲中文字幕一区精品自拍| 又粗又大又黄又爽的免费视频| 久久精品国产久精国产| 美女裸体自慰在线观看| 一本一道波多野结衣一区| 久久久久国产精品无套专区| 亚洲综合一区无码精品| yy111111少妇无码影院| 亚洲美国产亚洲av| 久久精品国产免费观看三人同眠| 99久久夜色精品国产网站| 伊伊人成亚洲综合人网香| 久久精品国产亚洲AV果冻传媒| 乱中年女人伦av一区二区 | 人妻少妇久久中文字幕| 国产精品爽黄69天堂a| 台湾佬中文网站| 欧洲熟妇色| 亚洲中文久久精品无码| 日本五月天婷久久网站| 国产天美传媒性色AV出轨| 狠狠躁日日躁夜夜躁2022麻豆| 亚洲AV无码国产精品色午| a级大胆欧美人体大胆666| 国精产品一区二区三区| 色婷婷亚洲婷婷7月| 欧美人与动牲交a欧美精品| 亚洲精品久久国产精品| 欧美人与动牲交免费观看网| 一本大道香蕉久中文在线播放| 亚洲图片自拍偷图区| 午夜无码国产理论在线| 性色av无码一区二区三区人妻| 天堂网www在线| 黑人上司粗大拔不出来电影|